Upgrade of Chlorination Systems for Mekorot’s National Water Pipeline
Project Description: Upgrading of the
chlorination systems in three locations along the
National Water Pipeline.
Project Outcome: This project had the entire
equipment redesigned and replaced, including
piping, chlorintation and sterilization, electric
systems, and control system.
Проект реконструкции основной станции хлорирования для национальной водной корпорации Мекорот