Projects
Clean Link for Intel FABs
Project Description: Adjusting fabrication facilities to meet changing market demands, Intel Qiriat Gat required a new Clean Link to
connect two separate, existing “class 1 clean room” fabrication buildings. This heavy steel bridge, pre constructed and assembled on site, is a complex engineering operation, handled by E.Taieb Construction Engineers, as well as QC’s and Constructure Managers on site.

Project Outcome: Recognizing the importance of precise engineering of time and costs in terms of both labor and materials, we put the  emphasis on following a multi-stage project plan, free of clashes and well-coordinated with all related participants.

Межпроизводственная эстакада - мост соединяющий цеха завода Интель (проектирование и авторский надзор)
Intel Clean Link
More Projects