Projects
“Neot Hovav” WasteWater Treatment Plant Upgrade
Project Description: at Adama Makhteshim’s Neot Hovav site, a biological plant treats all industrial wastewater. The MBR (Membrane Bioreactor) uses membranes to recover water from the sludge. In case of malfunction, a quarter of this site’s treatment  apacity is disabled. Therefore, Adama had decided to perform a pre-project evaluating project alternative and estimated costs. It was then decided  o add two membrane sets to increase the system’s redundancy.

Project Outcome: By the very nature of this project, it had to be done before the rainy season. E.Taieb Engineering is highly experienced in carrying out complex projects requiring Project Management, multi-disciplinary engineering, permit issues from various authorities and procurement, therefore this project was carried out on a tight schedule and with a limited budget.

Реконструкция очистных сооружений сточных промышленных вод в Неот Ховав
“Neot Hovav” WasteWater Treatment Plant Upgrade