Regulation of Darga River – Netivei Israel
Project Description: Demolition of an old culvert and designing a new one, regulating the river bed. Construction of road embankment to resist oods.
Project Outcome: In Route 90 near the Dead Sea, which was previously closed to trac during heavy rains, a new water transferor as designed to move 640 cubic meters per second , thus allowing trac even during oods. To this date, this is the largest such transferor in srael.
Проект руслоукрепительных, дренажных и водопропускных работ и сооружений для компании Маац (Нетивей Исраэль) в русле реки Дарга